cancel
Showing results for 
Search instead for 
Did you mean: 

How to stop MRP from generating PR

0 Kudos

Dear all,

I have one material with MRP setting as follows :-

MRP Type = VB

Reoder point = 1.0

Planning Cycle = blank

Lot size = EX

Max lot size = 0

Max stock level = 0

Now, although there is no reservation and the current stock is zero. The MRP batch job still generate the PR.

MRP parameter :-

Processing key NETCH

Create pur.req. 1

Schedule lines 3

Create MRP list 1

Planning mode 3

Scheduling 1

Question :-

1. What is the right setting for me to configurre.

2. Do I need to delete/reset planning file entries and how ?

Rgds

Moktar Husain

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi,

First check your MD61 is there any requirement pending.

0 Kudos

Dear Rajendra,

There is no requirement types was found for that material in plant so and so.

Thanks.

JL23
Active Contributor
0 Kudos

what elements do you see when you execute MD04 for this material?

what is the quantity in your requisition?

0 Kudos

The qty created is one as per Reorder point.

former_member184655
Active Contributor
0 Kudos

Dear Husain,

If the reorder point level is 1 means,for that material you can use the MRP type as PD itself.

Is that a business requirement that strictly you have to use VB - Manual Reorder point planning?

Generally this MRP type is used for for the materials that are planned as per the normal consumption for the bulk materials or say

low cost items.It depends on the business req.once when the stock goes below the reorder point level,during the next MRP run

the system creates the procurement proposal for that material.

Normally this reorder level say you can fix it as 100 or 200 as per the past history or the average consumption.

If you want the system to create planned orders for the same ,check with the MRP control parameter value as 3 - create planned

orders during batch MRP run.

Check this link which you help you to understand in detail,

http://www.sapstudymaterials.com/2008/05/materials-planning-procedures-in-sap.html

Regards

S Mangalraj

Edited by: Mangalraj.S on Sep 17, 2010 12:03 PM

0 Kudos

Dear Mangalraj.S,

Basically, the requirement is to keep very minimum stock if the material is too expensive. So, if there is a reservation generated from the work order, MRP will trigger the PR. Now, since the plan delivery date of the material is 6 months in advance, MRP still generate new PR although the old PR has converted to purchase order.

P/S :

> I appreciate the link that you have attached and consider point for it.

Regards

Moktar H

JL23
Active Contributor
0 Kudos

the delivery of the PO is beyond the planning horizon, hence it is not taken into consideration for MRP run.

0 Kudos

Dear Jurgen L.

Now, if I simulate in test client without any outstanding PO generated beyond planning horizon period. Why it still generate PR ?

Can you explain on planning horizon that can trigger PR during MRP ?

Thanks in advance

Moktar H.

JL23
Active Contributor
0 Kudos

what did you see in MD04?

0 Kudos

Dear Mangalraj S.

Now, is it true that I must increase the stock equal or more that reorder point ? The problem is excpeted delivery date is in Jan 2010. The GR can only be performed next year.

Rgds

Moktar H.

0 Kudos

Dear Jurgen L,

If I execute below parameter, I system will generate PR with qty 1 and display current stock as zero.

MRP parameter :-

Processing key NETCH

Create pur.req. 1

Schedule lines 3

Create MRP list 1

Planning mode 3

Scheduling 1

Rgds

Moktar H.

JL23
Active Contributor
0 Kudos

I asked about the details of transaction MD04.

former_member184655
Active Contributor
0 Kudos

Dear Husain,

1.What is the reorder point and the current stock of that particular material?

2.After taking MRP run,for what quantity is the system throwing the PR?

3.If you dont the system the create PR means what is your expectation?

Regards

S Mangalraj

0 Kudos

Jurgen L,

Below are the details when i executed MD04.

Material 50464023 RING,LABY,COMP,MHI,MTV27

Plant 2001 MRP type VB Material type HIBE Base unit PC

Date MRP elMRP element dataExRec./reqd qtAvail. quant

21.09.2010Stock 0.000

01.11.2010PurRqs0010928555/0001001 1.000 1.000

Rgds

0 Kudos

Mangalraj.S,

1. The reorder point is 1 the current stock now is zero.

2. After MRP run the PR created with qty 1.

3. My expectation is no PR generated since there is no reservation/demand needed.

Thanks

Moktar H

former_member184655
Active Contributor
0 Kudos

Dear Husain,

Whether there is any reservation or demand for this particular material,but the sysem will create a PR for this material for 1

quantity as the current stock is zero.This is the standard SAP behaviour for reorder point level fixed materials during MRP run.

Come back with your further queries.

Regards

S Mangalraj

Former Member
0 Kudos

Dear Husain,

Unable to understand exactly your query, based on what i understand

You want MRP should not create ant PR for one particular material

then just make MRP type as ND

Regards

Madhu

Former Member
0 Kudos

Check in MD61 what is your requirement. Based on that only it will trigger the pr