Group and Group counter in Routing

Former Member

Hi all,

what is group and group counter in routing , how these are used in routing , please explain.

Regards,

Joseph.

Accepted Solutions (1)

Accepted Solutions (1)

sundaresan_velayudam
Active Contributor

Group:

In group we can group the routing, it may be one group fora material or one group for a plant, or for one group for aone production line.

Group Counter

indicates the Sequenec of operation for header material and components uniquely

Answers (3)

Answers (3)

former_member184655
Active Contributor

Dear Joseph,

1.Each routing is stored against a group and group counter no.

2.When we create routing without respect to any material and only by giving the plant,the set of operations gets saved under one

group counter and group no.

4.Many materials can be assigned to this same group and group counter no,so that the routing is valid for all the materials included.

5.When you create a routing for material specific,the set of operation gets saved in a group no and group counter no as 01,when

you create another routing with another set of operations for the same material,plant and task list combination now the group no

remains same and the group counter gets saved under 02.

6.This data can be further helpful in assigning the routing data in the production version,.

Check and revert

Regards

S Mangalraj

Former Member
0 Kudos

Hi all,

If i create more than one group counters under one recipe group and assign those for different production version for one material and when costing run is done which production version is taken for the costing of the material...?

Regards,

Joseph.

Former Member
0 Kudos

Dear Joseph,

1) Default system will consider first production version

2) Also while doing costing we have option to give second Production version if required

Regards

Madhu

Former Member
0 Kudos

Hi madhu,

To give the second pv we have to go to ck11n and in qty structure we have to give the second pv rite....Is there any option to select pv in CK40n t-code ...?

former_member196530
Active Contributor
0 Kudos

Dear

You should do it through KKF6N where you have opetion to select the PV .I do not think so you have in CK40N-Edit Costing Run .

Regards

JH

former_member184655
Active Contributor
0 Kudos

Dear Joseph,

Assign the production version in Costing 1 view of the material master which you want to be considered during costing run and

check the costing run results.

Check and revert

Regards

S Mangalraj

jithu123
Explorer
0 Kudos

I have copied the bom from one material for my different material, but group number is same and group counter is also same,

when i am creaing production version then system showing routing is not valid always in same lot size interval

Former Member
0 Kudos

hi..

Each routing is stored against a group and group counter no.

When we create routing without respect to any material and only by giving the plant,the set of operations gets saved under one

group counter and group no.

Many materials can be assigned to this same group and group counter no,so that the routing is valid for all the materials included.

Former Member
0 Kudos

Group Counter: This key and the task list group uniquely identify a task list.

In Production Planning and Control, it serves to identify alternative production processes in task lists and

is used to make a distinction between similar task lists.

for ex. The group counter can be used to identify different lot-size ranges.

and Group is the Key identifying a group.

A task list group combines task lists that:

1. Describe similar production processes

2. Are used to produce similar materials

A task list group can be used, to group task lists with different lot size ranges.

In combination with the group counter, the task list group uniquely identifies a task list.

You can use groups, to identify two routings that have different production steps for one material.