cancel
Showing results for 
Search instead for 
Did you mean: 

Transport of Object from Development to Production

former_member328462
Participant
0 Kudos

Hi,

I made some changes on routine in 3 DTP

each time i made changes, the system prompt with a transport number (ADXXXXXX), i click the green tick in order to save it

when the 3 transport number is being release to production system, it seem like more then 3 transport number being updated at production system

Q1 - is my transport number being accumulate together with other changes under one SR ?

Q2 - how to seperate the transport number I mean can I assign it to local so that i can transport it under one SRxxxxx?

Q3 - where to find the SR and transport number ? any Tcode ?

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Felix,

1) All the changes can be accumulated in one SR during

transport

2) You can find the transport details under the following

transactions

se03 - search basis

se09 - user id basis

Regards

R. Senthil Mareeswaran.