In a routing, I have 4 operations. we have a control key with auto GR ( ZP04). In my understanding , Auto GR can be set for only one operation. But I have used this control key for all the 4 operations. THe routing is saved without any problem.
How come tthis is possible.
And when i confirm the second operation there was goods movement too.
PLease help me how can this happen..