Hello Gurus,

I am creating process order without material and assigning Production Scheduling Profile in assignment tab. Production Scheduling Profile has release on creation activated in configure, but when I save process order its not released, it remains as CRTD.

When I am creating process order with material as you know Production Scheduling Profile is copied from material master and when I save process order, its automatically released.

I am assigning same Production Scheduling Profile which I am using for second case listed above.

Any ideas?

Thanks

Bhavesh Patel

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hello All,

I am using process order and creating process order using CORO. The configuration is set properly. As par configure, its suppose to release when I create process order and save, but that is not happening. If I create process order with material using COR1, its release when I save after creation in COR1.

Thanks

Bhavesh Patel

sundaresan_velayudam
Active Contributor
0 Kudos

Dear Patel,

I Already told, once , you are in order screen, system status will set as CRTD, after that if U assigned, the PSP, It won't work, In case of COR1, material have PSP, If you convert planned order to production, release is triggered in background before the status is created.

If you have still doubt

Create a order in COR1, When you enter the quantity and start date finish date then release is carried out and the status is set as CRTD

in CORO

It is not possible to maintain PSP before entering the qty and Dates

Once U entered the dates, Sytem set the status as created, After you assigna PSP, It won't work

Regards,

Sundaresan

Edited by: Sundaresan . E. V on Sep 14, 2010 7:01 PM

former_member196530
Active Contributor
0 Kudos

Dear

Please goto OPKP and re-check -Select Production Scheduling Profile -Goto Automatic Action -Hit Rlease Check box -That means you are asking systme to relase the production order once itr is being created .

Now try to create Production Order and once it will created , Relase will happene automatically .By the way , how are you creating Production Order with out material ? Reference to Sales /WBS through CO07??

Is there any user exit running for Production Order Relase for authorisation control ??

Just check in your side and come back

Regards

JH

sundaresan_velayudam
Active Contributor
0 Kudos

In Production scheduling Profile, The release setting is checked at that time of order creation,

IN case of production order with out material ,you have assigned the production scheduling profile after the order status as created " CRTD" , SO this seeting won't work for order with out material

Regards,

Sundaresan

Former Member
0 Kudos

Hello,

I am assigning PSP while creating process order not after created.

sundaresan_velayudam
Active Contributor
0 Kudos

while assigning the production scheduling profile, check the order status, The status should be as CRTD

Edited by: Sundaresan . E. V on Sep 14, 2010 4:30 PM

Former Member
0 Kudos

Hey,

The order is in CRTD status while creating process order.

sundaresan_velayudam
Active Contributor
0 Kudos

Thats the reason the production scheduling profile setting for auto release is not working in Process order with out material

former_member184655
Active Contributor
0 Kudos

Dear Patel,

If the setting or the check box for On Release is included under Automatic Actions --->On Creation,while creating the production

order without material in CO07,after giving the req quantity,date and the settlement parameters the system automatically releases

the order in CO07 itself.

check in OPKP for the prod scheduling profile settings.