HI friends,

Even after deleting the material from the activity, the system is giving the following error message

Activity 0010 has been assigned material components - Deletion not allowed

The status of the activity is REL.

One purchase order already created for this WBS element.

The material found deleted from the activity but why it is giving the same message.

Activity 0010 has been assigned material components - Deletion not allowed

Edited by: M.Alagesan on Sep 13, 2010 1:15 PM

Accepted Solutions (0)

Answers (6)

Answers (6)

former_member494495
Active Contributor
0 Kudos

This note will give the solution i think

Former Member
0 Kudos

Check this note 418017, but it is valid till 4.6C SAPKH46C23

Praveen

former_member203108
Active Contributor
0 Kudos

Alagesan,

Read this note and understand.

Note 418017 - Network: Physically delete activity fails with CN319

former_member203108
Active Contributor
0 Kudos

Alagesan,

Read this note and understand.

Note 418017 - Network: Physically delete activity fails with CN319

Former Member
0 Kudos

deleted---

Edited by: b praveen savan on Sep 13, 2010 5:10 PM

Former Member
0 Kudos

Is that material already consumed?

Generally when you try to delete the operation, it also deletes the dependencies of the activity, i.e., it deletes the components associated to that activity, if it is not issued to the order.

Check the details in your system.

Praveen

former_member494495
Active Contributor
0 Kudos

Hi Praveen,

NO. It is still in stock only.

thanks

Makal
Active Contributor
0 Kudos

Is it a project stock or free stock?

If it's project stock, then move it to free stock.

former_member494495
Active Contributor
0 Kudos

HI

It is a project stock. how should i move to free stock ?

Former Member
0 Kudos

You can use 411 movement type for moving the project stock to free stock. But it has nothing to do with the material assgnment to activity. As stock always exists at the WBSE level and you have created the reservation to the network activity?

Check the above note once.