on 09-13-2010 7:31 AM
hi,
how to create multiple batches in same production order and how to pack different batches in packing.
thanks in advance
chandu
while doing GR ,You can split the quantity as per the batch quantity and assign the batch number in GR goods movement and add other line item for other batch( in Co11n or MIGO/MB31. ANd issue the respective batch and quantity for packing
Edited by: Sundaresan . E. V on Sep 13, 2010 12:13 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
in one cassette i will pack 100units this i am doing through packing instruction.
but some times i need to pack 90units or 110units too.
in this 90units and 100units with multiple batches
packing we are doing with production order ref through COWBPACK.
kindly give me configuration steps to run above requirement.
thx
yes we can give the multiple batches in the cowbpack but we are receiving more no of packs
in that i recd for 900nos 225 in one batch 100 in one batch 350nos in one batch 125nos in one batch and
100 in final batch. if it is 100 no problem it will fit in to one pack for remaining 25,50 also packed separate pack
finally if i want club 25 & 50 nos while out bound delivery how to do this. because please check above batches
255025 are there in three batches if i want to club this 3 batch nos in to one pack with 100nos how to do this.
thx
Edited by: chandu s on Sep 13, 2010 12:18 PM
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.