Skip to Content
0
Former Member
Sep 13, 2010 at 04:34 AM

Batch Determination in Process Industry (PP-PI)

2565 Views

Hi all,

I'm having an issue at the moment wherein when I user manually execute batch determination for a material, system will prompt business that Batch determination for the selected material without selection data. Upon hitting Continue, system will advise that no search strategy could be found. I understand that the batch strategy needs to be configured for this error to be resolved but the point is not setup as a category product and shouldn't be required a strategy.

How can I stop the system from requiring the batch strategy before the material can be allocated a batch number?

Cheers

Patrick