Hi Experts,

Need your help in resolving the below issues:

We are having 3 system landscape of solman (DS1-QS1- PS1). PS1 is the central domain controller for all the systems including Solman. We have configured the charm process in DS1 and it is working fine. When we moved the transports to QS1 and when i am creating maintenance project for the landscapes, i am getting below error:

system PS1 is not known in change manager

no track for project Z_X39 with log.system D39/10

message from function module /Tmwflow/check_proj_cons: No rfc desitnation for domain controller PS1.

When i checked the RFC in DS1, we dont have any RFC from DS1 to domain controller (PS1) and it is working for all the charm processes.

Please help with early resolution.

Regards,

Imran

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 13, 2010 at 03:10 AM

    Hi,

    Our default authorizations for remote READ RFC users (created in SMSY)

    do not allow us to read transport requests information. But READ RFC

    users are used extensively in Charm to get those information.

    So please I kindly ask you to manually maintain the user add the

    appropriate authorizations (e.g. profile S_TMW_CREATE).

    Please, perform the recommendations above and take a look at our

    expert's blog:

    First steps to work with Change Request Management scenario

    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario

    Change Request Management scenario: Working examples

    /people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples

    Change Request Management scenario: Usual questions and known errors

    /people/dolores.correa/blog/2009/07/22/change-request-management-scenario-usual-questions-and-known-errors

    2. How to work with target groups

    3. How to work with transport groups

    Hope this helps.

    Cheers

    SH

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 13, 2010 at 07:35 AM

    Hi,

    Thanks for your response. I already wnet through the blogs and other document in the links. Just wanted to reconfirm one thing -

    As mentioned in my query, we are having Solman - Production as central domina controller for all the systems. So do we still need RFC destination to 000 client of Solman Production system?

    If yes, once we finally move to solman-Production, do we still need to have RFC from 010 (Charm client) to 000 of the same system.

    Appreciate your quick response.

    Thanks and Regards,

    Imran

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.