cancel
Showing results for 
Search instead for 
Did you mean: 

SNP planning can be done at what level?

Former Member
0 Kudos

Hi

SNP planning can be done at which of the following levels?

1. Location level

2. Product level

3. Multi level for all locations for individual product

4. Multi level for all locations for all products

Kindly guide me on this. (This is a sample certification question)

Thanks in advance.

Accepted Solutions (0)

Answers (2)

Answers (2)

somnath_manna
Active Contributor
0 Kudos

All four are possible

1. Run SNP with scope of planning set as Location (Heuristic) with Manual Selection having Location only

2. Run SNP with scope of planning set as Location (Heuristic) with Manual Selection having Product and Location only

3. Run SNP with scope of planning set as Network (Heuristic) with Manual Selection having single Product only

4. Run SNP with scope of planning set as Network (Heuristic) with Manual Selection having all the Products

Former Member
0 Kudos

Hi,

SNP planning can be done at Product leve of your company.

Regards

Nagaraju

Former Member
0 Kudos

Hi Nagaraj,

Thanks for your prompt response. Is it only at Product level or can be at Location level as well?

Kindly guide me on this.

Former Member
0 Kudos

Hi,

in APO SNP location and product are standard characteristics and we can plan at product and / or location levels for sure.

Regards

Datta