Copy actual to plan

Dears,

someone knows if there is a way to copy the actual value present in a cost center in the version 0 as planned values in another version? I tried with transaction KP98 but it is not useful in this case since that transaction copies the actual value present in the cost center xxx in the version 0 as actual value of the cost center xxx in the version YY.

many thanks

Vittoria

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Sep 10, 2010 at 03:12 PM

    Hi,

    There is no such a thing as 'actual values in version YY'. Actual values are stored only in version 0, and KP98 is the right transaction for your requirement.

    Regards,

    Eli

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.