cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection lot stock window missing in qa11

Former Member
0 Kudos

Dear Gurus

I want to inspect the lots that are generated while goods posting in mb31 mvt type101 after process order.For that in material master quality view I have taken inspection type 04 ,did an inspection plan (qp02).Now after doing the process order and after recieving the goods a lot is getting generated.While I am doing the usage decision I couldnot do the goods

posting from quality stock to unrestricted as Inspection lot stock window missing in qa11. What else should I do ?

Regards

Sandip Sarkar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

What is the status of the lot?what is the lot no?Can you see the stock in Quality?

Vishal

Former Member
0 Kudos

The staus of the lot is ud icco orrq.The lot no is 40000000006. Yes the stock can be seen in mmbe under quality stock and it can be transfered to unrestricted thru mb1b mvt type 321

Regards

Sandip

Former Member
0 Kudos

What was the status of lot before taking UD?

Former Member
0 Kudos

Hi,

This specific lot does seem to me like it is manually created, there is no system status to say SPRQ or SPCO, therefore is doesnt appear to be stock relevant. You also mentioned that you can move the stock via MB1B, the system will not allow you to do this if the stock in question is being managed by an inspection lot, it will give you an error that the stock can be released via QM only.

Check the material documents linked to the inspection lot 40000000006, does it display any material documents of type 1 (material document for lot creation)? if not then your lot is definitely manually created.

Regards,

Roderick

Former Member
0 Kudos

Hi

The lot is automatically created. The lot is created after I did 101 in mb31 for a particular process order . If I have done manually I would have to told you .Not only this lot every time I am posting the gr for process orders for this material it is behaving like this .This is a new client .Some SPRO setting may be there.

Regards

Sandip Sarkar

Former Member
0 Kudos

What was the status of lot before taking UD?

Former Member
0 Kudos

Hi Vishal

Before ud status was insp rerc orrq.After ud the staus is

UD Usage decision has been

PASG Plan/specification assig

CCTD Insp. characteristics cr

CALC Sample calculated

RREC Results confirmed

STIC Short-term insp. complet

ICCO All inspections complete

STUP Statistics updated

ORRQ Order record required

Regards

Sandip Sarkar

Former Member
0 Kudos

Hi

I got the solution. In the qm view for 04 inspection type the check box insp for hu was activated.As soon as I removed the tick and created order and recieved it the lot showed the status sprq .

Thanks

Sandip

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

There is a possibility that the lot could of been created manually, if this is the case then there will be no stock posting tab as manually created lots are not stock relevant.

Regards,

Roderick

Former Member
0 Kudos

The lot has been created automatically, not manually.

Regards

Sandip