on 09-07-2010 9:28 PM
Hi All,
Can any one help me, In Tcode-OBA3 we have Grace period Field which is for
Tolerence froup for a perticallar ccode, the grace period Is configured 1 day
right now, if his 1 day period falls on friday the system take for weekend day
which my cleint doesn't want they want the due date should fall on businee day,
i checked every where but there is no exit for this Tcode, we have this option
in Dunning procedures for holiday id, Can any one help me the approriate
solution how to solve it.
Thanks a lot
Rashee
Hi Rash,
while entering the t-code OBA3
In the menu bar select the Selection->By content
then
select the Field Lable----Grace days for determining due date
then enter
Now you can give the condition
as you required.
regards,
Ramanuja
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you so mush for the reply, I checked "my contents" got little confuse, an you please help in condition, The requiremnt is the Holiday key, The garce period should fall on monday if the due date is on friday, The grace period is 1 day, if it falls at friday it should take monday, Please help.
Thanks
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.