Skip to Content
author's profile photo Former Member
Former Member

ME5A T code Capturing wrong PR Release Date

Dear All

I am an enduser, we have a KPI for our Procurement team to capture the Avg PR to PO process time.

To do so we mainly require PR final Release date & correponding PO Release date.

we are using Tcode Me5a to get this details, But it capture wrong PR final release date.

we need to made a vlook with PR dates obtained from table AJ_log_rel.

Do we have any other standard report in SAP which capture PR Rel date & corresponding PO creation or release date.

Thanks in advance.

Regards

Rahul

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 07, 2010 at 03:35 AM

    ME5A it wont show the pr release date.

    If you want to see the exact pr release date ME53N item changes you can get the exact release dtae.

    or else ask your abaper to develop a report. To get this pr release date ask him to pass the pr no in those table CDHDR & CDPOS.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.