Dear gurus,
I'm new at BPC version NW, and I'm with a problem with Total at dimension Time.
When I create a new input schedule with EVDRE(), with time in column, per ex., the values are not totalized to TOTAL.2010, however if I put 2010.Q1 values are totalized to this one.
Is there anything i'm doing wrong?
Best regards,
Vitor Ramalho
Hi Vitor,
First, I would request you to post this question in the NW forum to get better respose rate,
Secondly, coming back to the issue, the time parents are calculated based on the ISBEGINNING. Please check in the apshell, whether you are facing the same challenge. Dont make any changes to the standard time dimension and check.