on 09-06-2010 10:25 AM
Hi Gurus,
There is activity type XYZ created and when in do KB21N and enter the cost center and activity type the rate is calculated.
I do not know where is the rate maintained. It is coming 27.96 hence how the system is taking 27.96 rate for 1 Qty.
Regards.
rate is maintained in KP26
Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Instead of using KSII - if a political actual rate needs to be maintained, KBK6 can be used in place of KSII. KBK7 will display a rate calculated and saved with KSII or manually set with KBK6. As an alternative report to KBK7 - use KSBT the the PrI for 3 and 7 indicate plan vs. actual.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Planned Activity rates are calcualted in KPSI and updated in KP26. Actual rates are calculated in KSII and can be viewed in KBK7.
Please check the rate in KP26 for the period/cost center/activity combination
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.