Hi Gurus,

There is activity type XYZ created and when in do KB21N and enter the cost center and activity type the rate is calculated.

I do not know where is the rate maintained. It is coming 27.96 hence how the system is taking 27.96 rate for 1 Qty.

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

ajaycwa1981
Active Contributor

rate is maintained in KP26

Ajay M

Former Member
0 Kudos

thnsk for the reply

Answers (2)

Answers (2)

0 Kudos

Instead of using KSII - if a political actual rate needs to be maintained, KBK6 can be used in place of KSII. KBK7 will display a rate calculated and saved with KSII or manually set with KBK6. As an alternative report to KBK7 - use KSBT the the PrI for 3 and 7 indicate plan vs. actual.

gsgiri
Participant
0 Kudos

Planned Activity rates are calcualted in KPSI and updated in KP26. Actual rates are calculated in KSII and can be viewed in KBK7.