Dear Experts,

sorry to intrude your mail boxes and thank you very much in advance for any pointers.

I am facing a problem with respect to Materials (material masters).

We have a newly created SAP system connected to our SRM. In this newly created SAP System, the generation/migration of material masters happens for a large number of materials currently. This generation and migration of material masters in this R/3 system has nothing to do with SRM and is only required for the operations within the R/3 system.

But for some reason, all these materials that are being created in this R/3 system, are trying to "make their way" into the SRM, but actually this is not required. As a result, the outbound queue of the R/3 system is completely plugged.

Can you help me understand, which setting could be responsible for the fact, that the material masters are trying to get into SRM. Can this be setting on R/3 or on SRM side and which settings can that be?

Thank you very much.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Sep 05, 2010 at 01:10 AM

    Hi

    Have you scheduled any job SMOF_DOWNLOAD PROGRAM ?