Skip to Content
author's profile photo Former Member
Former Member

Dynamic Safety Stock not considered during PPDS Plng

Hi experts,

Because of the customer business requirements, we have to set up the

dynamic safety stock in PPDS.I have followed instruction of sap note

855592, 517898 and 761872 however PP heuristics does not take the

dynamic safety stock or days supply values into account when creating

the recipts. However If I use SNP location heuristic in the SNP

planning book and planning results take into account the dynamic safety

stock quantities entered .

I have done the following actions:

Version 000 is Take Safety Stock into Account for PPDS, as per

recommended in SAP Help, I filled it with value 2, consider virtual

safety stocks elements. SAP help states that method 3 does not support

dynamic safety stock.

I activated Planning Area 9ASNP05, and I am using standard planning

book 9ASNP_SSP. I assign Planning Area 9ASNP05 in the Global parameters

in the PPDS Customizing.

I also make active PPDS customizing u201CMake SNP Key Figures Availableu201D,

the Safety Stock function is set for Key Figure 9ASAFETY.

For the material, I am using safety stock method MB in the product

master tab, actually I need to use MZ but I thought that I would be

easier to test first with MB. Units of measurement conversion between

material base unit and planning area base of unit are correctly

maintained.

There is RFC connection for the BW client u2013 I read that this also in

above SAP Note.

I have also tried to run the SNP Safety Stock planning just in case but nothing

occurs (/SAPAPO/MDSP_PB),I get a message that says that product cannot be planned

successfully because it has not extended safety stock method. I am not

expecting to see any safety stock order in the product view, I am not

running safety stock heuristic ( /SAPAPO/HEU_PLAN_SAFETY_STOCK) as SAP

states that it does not support Dynamic methods; I just need that PP

Heuristics consider the variables safety stock or days supply values

maintained into the Planning Book.

Thanks for your suggestions

Carlos

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Aug 27, 2010 at 11:02 AM

    From your description I cannot see any error. All settings are correct.

    I am sorry.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 11, 2010 at 10:30 AM

    Problem was that I made an error in the customizing above explained. Plng Obj Strucure has to be 9AMALO.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.