Skip to Content

Help with switching off / removal of Vertex integration with S4H 1809 System

Hi,

We currently have a system upgraded from S4H 1610 version to S4H 1809 version. Vertex integration was used in the S4H 1610 version of the system but in the upgraded system (S4H 1809) we do not need this integration.

Need help in getting pointers on how the Vertex integration can be switched off. By switching off, we mean that we don't want Vertex to be called at any level be it sales order creation, invoice creation, purchase order creation, etc. Any help on getting this integration removed/switched off will be appreciated.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.