cancel
Showing results for 
Search instead for 
Did you mean: 

MD04- show delivery date when using a GR processing time

Former Member
0 Kudos

Hi all,

If you have a planned delivery time as well as a GR processing time on the material master- is there a way of showing the actual delivery date (from the PO) and not the total lead time (planned delivery date + GR processing date)?

Thanks in advance.

J

Accepted Solutions (0)

Answers (1)

Answers (1)

madlercm
Active Contributor
0 Kudos

I think that there's a button on the bottom of MD04 labeled "GR" and switches to "AV", that you can use exactly for that, switching between the two types of lead time.

Regards,

Mario