on 08-26-2010 12:41 PM
Hi all,
If you have a planned delivery time as well as a GR processing time on the material master- is there a way of showing the actual delivery date (from the PO) and not the total lead time (planned delivery date + GR processing date)?
Thanks in advance.
J
I think that there's a button on the bottom of MD04 labeled "GR" and switches to "AV", that you can use exactly for that, switching between the two types of lead time.
Regards,
Mario