Hi Gurus,

Any impacts and considerations to enable the PP and PPPI at the same plant?

Thanks in advance.

Paul

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Aug 25, 2010 at 09:23 AM

    No. The only thing is that the production areas must be separate. It doesn't make sense to have the same physycal work center both as resource and WC in SAP.

    Also, a certain material is manufactured either with PP or PPPI, not both.

    On a more general level, do you really need to use both? From an implementation and usability point of view you should avoid such a situation, even if systemwise it is possible.

    Regards,

    Mario

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2010 at 10:01 AM

    Hi,

    There is no impact if you using both PP & PPPI for same plant.It is like some area require PI sheet functionality & another area require discrete functionality I had used both functionality in the same plant in my project .There was no issue.

    Regards,

    Vairavan.P

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2010 at 01:20 PM

    Hi,

    The work Areas should be different, different stor locations, if the business process is a combination of both discrete and preocess, no issue you can proceed.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 25, 2010 at 01:29 PM

    Hi,

    No such any impact. but in case in future, if you implement BI module or any report is developed for consolidated production.

    That become difficult task, you have to consider different tables. It result in dificult in consolidation.

    Try to use any one, if possible because you can carry out major think in one PPPI or PP.

    Rgd,

    Chetan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      There is no issue. Even we have used PP and REM in our single plant, no separate storage locations needed. Just Order type would be different but in your case that can be the same as you are using PP and PPPI almost similiar. Yes as far as BI is concerned the things need to be handled very technically but in case of Z Tables and Z Queries other wise if you are using LIS than no need to worry about it. It lot depend on your BI Consultant/Functional Consultant how they implement it. Some Master data Tables can also be used to address the problem in BI Reports.

      Thanks

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.