on 08-25-2010 6:46 AM
Hi all,
Daily morning i doing some support work as well. i think i done one mistake. BW3.5 Data flow ds-IC delta load in
DS->processing type-> data target only. Yesterday it shown red request in IC i deleted that request and try to put repeat still data
not loaded. again today also target showing red request. this following error coming please guide me.
Deleted that request in target is i made wrong? what solution.
Error:
Status tab:
-
Diagnosis
An error occurred in the source system.
System Response
Caller 09 contains an error message.
Details tab:
-
Error occurred in the data selection
Did you made the request to Red before deletion of request? If you did that nothing to worry about delta load .. in next delta you will get them
Did you get any records in monitor ? check job details in R/3 and BW as well for more details
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I deleted that red request only right why not i repeat and get 23 and 24 data. Please correct me i am wrong.
-> PSA no data.
-> IC- 23 red request i deleted and now 24 th request also red but in IC monitor showing records and data not ready for report.
What solution i have to do? Please give suggestion on this.
thanks
Hi sri,
When you launch the Infopackage did the system proposed you for 'Repeat delta' ?
- No it not responding
IC Monitor - Is the request is green ? but not reporting symbol .. right ?
- No it is in red request only
Did you expand the request in monitor - details tab - expand all the nodes and check If you see any red msgs
- Error occurred in the data selection and process chian fail this red message only coming.
thanks
In production system delta daily load.
-Chek source system connection
- connection ok
-Replicate the datasource again fro R/3
Modeling->DS->Sales and Distribution->replicate - please confirm i am correct
-Activate Transfer rules
- using above that activate report progrm i can do right.
-Start IP
Before this delete today error request ffrom IC and manually start execute.
sri please confirm i am right above statment i can follow that.
Did you performed above steps ? What is the volume of data in the target ? Cube or DSO ?
Re-init is final option ..
what u have done, could you give the solution..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
replicate the Data source once again and activate DS with this program RS_TRANSTRU_ACTIVATE_ALL and it will solve your problem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Did you change the monitor status of the request to Red as well? before extracting the data to CUBE?
Also is this Delta is from Source R/3 or from lower level ODS?
If its from the lower level DSO then check whether the data mart symbol is present in the ODS --> Manage and its point to the failed load, if yes then you need to delete the same and then reload so that the load will work fine.
Also when the load failed initially did it picked any records or not?
About Caller 09, as this is related to the time stamp issue, replicate the data source and then activate the transfer structure.
If you have the same problem for many Data Sources, use the RS_TRANSTRU_ACTIVATE_ALL program to activate all IS's at a single go.
-Execute Program in SE38
-Provide Source System name & enter * in Info Source field
-Hit execute.
Once after this you can test you load.
Hope this helps
Murali
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.