cancel
Showing results for 
Search instead for 
Did you mean: 

Workflow created in wrong client

Former Member
0 Kudos

Hi all,

One user is testing in CRM 200. When he creates a move-out document, I assume through an FOP that connects to ECC 200 through RFC, the document is created in ECC 200, but the workflow is created in ECC 100. The event trace log indicates that the RFC destination is WORKFLOW_LOCAL_100, instead of the expected WORKFLOW_LOCAL_200. When I create a move-out document manually in ECC 200, the event trace log properly indicates that the RFC destination is WORKFLOW_LOCAL_200.

I do not know where to check, help me.

Thanks

Praveen

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

It's working fine now. No idea why it was not working correctly before )