on 12-05-2016 5:10 AM
Hi Experts,
My query goes like this:
I am using simple Loading process where, I create TU, assign Door and then Load picked HUs into TU during Outbound process.
My Outbound Delivery has 2 line items and I pick 5 HUs for each line item. After picking, I load HU by HU into the truck. Now, while doing so, when I load 5HUs of 1st line item, my Loading status is getting changed to "Completed" and I am not able to load remaining 5 HUs of 2nd line item.
We activated auto GI after Loading, so as soon as Loading status is completed, GI happens automatically.
I cross checked in system by Loading 1st HU of 1st line item and Loading status will change to "Partially Completed." However, when I load all the HUs of 1st line item, my expectation is that, Loading status should be "Partially Completed" only, where as it is getting changed to "Completed" and not letting me load remaining HUs of 2nd line item.
Request you to throw light on how can I achieve my requirement of Loading all the line items.
Thanks in advance
Ravi
Hi C K Reddy,
I am trying with RF Menu only. However, the issue is now resolved by referring Notes# 1460370 & 1461585. Hence, closing this message.
Thank you
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ravi,
Did you try with RF menu ?
outbound process (04 )-loading ( 03 )-loading by HU (05).
BR,
C K Reddy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.