Dear All,
Like to check among you if this case happen to you?
Got a PO, GR was performed thru MIGO upon Save 2 GR was posted corresponding to 2 material documents. In PO History tab can see 2 movement 101.
Our system was configured to have 0 tolerance in over delivery. Were expecting that the system won't allow another GR.
We also checked MKPF table entry and found a 9 minutes difference between 2 matdocs. We suspect delay in table update.
Any inputs/information is very much appreciated.
Thank you.