Using Dynamic factory calendar in BRF+ Rules (DSM scenario)

Hello Colleagues,

I have built a BRF+ application to derive delivery dates using the Date functions. I tried to dynamically set the Calendar ID using application exit class (in the method IF_FDT_APPLICATION_SETTINGS~GET_CALENDAR). When I deployed the BRF+ functions to target system using DSM, I have noticed that Calendar ID '01' was defaulted in the generated code.

While deploying, will DSM consider application exit class and settings maintained in it?

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.