MDBT - Background MRP

14 Views

Hi Experts,

I have created variant & schedule it daily in MDBT. Schedule start immediate. Then system generated PR for material.

I have maintained MRP type VB,Reorder point as 10,maximum stock level 100 and Lot size HB in material master.

Current stock was 5 then system generate PR for 95 Unit as I expected. I have test this scenario in DEV server.

Same scenario I have mapped in Quality server. But when I start sheduling immediate in MDBT, system do not generate any PR

even if stock falls below min. level

Where is prolem?

Please help.