cancel
Showing results for 
Search instead for 
Did you mean: 

103 movement inspection for spares and engineering materials

lakshmi_prasad7
Contributor
0 Kudos

can any body tell me how to control engineering and & spares materials when i done GR against 103 movement inspection lot is created but there is no control of goods is keep in quality but system allow 105 movement total quantity also how we will control the quantity if it is in quality stock any settings is required kindly send me guidelines

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hii,

103 movement is GR w.r.t P.O into GR blocked stock. Generally GR blocked stock means keeping the material outside the plant. The stock displayed in GR bloocked does'nt considered into inventory stock.

103 movement will be activated were the stores want to put some Quantity check on the material & where the Purchase dept does'nt want to take any accountability for the supplier deficit stocks. (In 101 immediately accountability take place and reflected in the inventory and FI document gets generated).

In MIGO after 103 movement, user can immediately release stock from GR block stock in the same screen (A05 Release from GR blockd stock). From Quality point of view u need to go with 103-105 movement type. Here don't activate Quality for 103 movement but activate quality for 105 movement type.Bcoz in 103 after inspection, u cannot show defect material in Blocked stock and it will remain in GR blocked stock. Confusion remains between new material and defect material where bothe will remain in GR blocked stock.

In short 103 - Quantity check (stores activty, no Inpsection lot)

105 - Quality check (Quality activity. Inspection lot)

Edited by: Lokesh K on Aug 10, 2010 1:03 PM

lakshmi_prasad7
Contributor
0 Kudos

Thank you very much ur reply but my query is when i do 103 mov it is non valuated material when i do 105 mov it is valuated material my user want non valuated any idea kindly revert me