How to calculate labour cost ?

20 Views

Dear All,

In my scenario one operation i.e. winding. in winding operation i have take set up time 12 hr. , machine time 48 hr., and labour time is 48 hr.as per calculation system show correct cost for that order. but in that operation i have used three (3) labour but in production order cost view only one (1) labour cost showing. how the three labour cost is showing.

Thanks ,

Parag