Add Inspection chaterstics to recipee After Inspection Lot Creation

Former Member
0 Kudos

In recipe I didnu2019t Enter Inspection Characteristics and inspection lot is created. Now I enter inspection Characteristics in Recipe with inspection points .Now I want to Attached Inspection Characteristics to Created Inspection lot. ?Is there any way to Attached Recipe characteristics after Creating inspection lot.?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Now I have two materials with different process order .When I Release Both Process order System will Generate Two types of inspection lot .When I view in Qa32, First inspection lot show with Red light and second inspection lot Show with Yellow light .In red light inspection lot my recipe and all Characteristics is picking and in yellow light inspection lot no Recipe Characteristics is picking. I have checked all MY QM settings. Now my Question is that Why system Respond in two different ways with same Settings . ? I want to know the difference ? .Option one is working fine but if we assign characteristics always then why we use recipe .?

Former Member
0 Kudos

In second case

1.Check the Valid date of the task list.Must be prior to that of Process Order Creation.

2.check Usage of recipe

3.In QM view.Auto Assignment is Ticked or not

Former Member
0 Kudos

Thnks Sujit.Its dates issue .Problem solved

Answers (2)

Answers (2)

Former Member
0 Kudos

If did not start recording the results reset sample calculation thru qac3,then access insp.lot in change mode qa02 and re assign the task list.

Former Member
0 Kudos

Hii,

Option 1:

It is possible to attach MIc to craeted Inspection lot using Unplanned Inspection characteristics. First Create MIC with complete copy model, then atach same MIC in Results recording : characteristics overview screen of Inspection lot.

Option 2:

Check whther the relavant Inspection lot Process order is partially confirmed and delivery made. If not, then u can make changes in Master receipe and the same can get reflected in the same Inspection lot. After chages in Receipe goto cor2-->master data -->slect relevant Pv's.

Else, If Process order is confirmed and delivery made , u cannot chage the inspection lot, then go with option 1 solutuon.

with regards,

K.Lokesh.