Hi,
When we are trying to activate integration model of stock and batches we are queue error in SCM inbound as "maximum timelimit exceeded".
lWe have already tried with following approches-:
Increased the maximum time to 2400 in SMQR settings
Spliting of integration model into multiple smaller model.
Will like know what is exact reason and what could be solution?
Regards,
Santosh
Hi Santosh,
Some suggestions:
1. If possible runthe job in background or increase the time out period i,e extending the timeout period.
2. Check the RFC connections : There may be a problem with RFC connection to destination.
When a queue forms and is pushed to the target system, the target system need to respond in a limited time sense, and this
will be only with RFC connetivity. You can check the RFC connection in RSA1-source systems-Right.click and check the
connectivity, this is at APO system.
3. Try running /sapapo/ccr for production and planned orders, carry out ,the iteration, clear all the queues and then rerun the transaction cohv. This will remove all inconsistencies in the system.
Regards
Datta
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.