BOM UPLOAD error

Hi Experts,

Here I have a problem while uploading BOM to the activities with REFERENCE POINTS.

Here I have a project and this project is having 1 WBS and WBS having 25 activities .

Each Activity trating as 1 floor.

While uploading the BOM for 1 floor about 500 materials in BOM it is uploading correctly .

If the number of floors and materail increased then the materials are not uploading properly .

Some floors are not uploading

and some materail not uploading to floors

In this case only 229 materails are uploading .

Here for uploading BOM they are using Z Transaction with the help of BDC.

Is ther any restriction for number of material in BOM.

Regards,

Mohan

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Aug 04, 2010 at 12:16 PM

    Hi,

    As far as my knowledge there is no restriction to the number of materials in BOM.

    Check your BDC program used to upload. Run the BDC in all screen Mode and check how it behaves when it switches to the second activity on the template. If data is very huge in Template split the files.

    Regards,

    Arul.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Mohan,

      As Arun said there is no restriction to the number of materials in BOM. Why not you compare the material master of successfully uploaded & failed material, it is possible that mateial master have different settings so it can give error in upload.

  • avatar image
    Former Member
    Aug 06, 2010 at 04:44 AM

    Hi,

    I think technically there should be no problem for uploading any number of BOM Items to Network activity.

    Your problem is somewhat related to Z program i.e. BDC which you have recorded. Please arrange to check this BDC for Page Up and Page down code whether it is written in Program ...Please check. Also I would like to suggest run this BDC in foreground to see exact screen on which this error gets occurred.

    First of all instead of using Z program to Transfer BOM..Use standard SAP functionality to Transfer BOM to Network Activity.

    CN33 - Bill Of Material Transfer.

    I think I understand properly if not please correct me.

    Swapnil P Kharul

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 17, 2010 at 11:09 AM

    its answered