cancel
Showing results for 
Search instead for 
Did you mean: 

SHIFT WISE OR DAYWISE INSPECTION LOT

lakshmi_prasad7
Contributor
0 Kudos

Here we faced lot of problem like i am working mines all raw materials we received 100 of trucks if i say iron ore i received one plant to another or purchase so if control the inspection lot for each material document batch storage location system should create every truck oneinspection lot if i go user exit i have to give logic vendor and batch and posting date system should create first truck gr inspection lot now my query is today i received 100 trucks 10000tonnes gr will happen truck base but inspection should generate total quantity for one inspection lot. same scenario in plant to plant stock transfer

Accepted Solutions (0)

Answers (1)

Answers (1)

lakshmi_prasad7
Contributor
0 Kudos

i will explore