on 07-29-2010 7:17 PM
Dear friends,
We are in the process of PI 7.1 upgrade. Our Dev system is now in PI 7.1.
Our production system in PI 7.0,Is there any way to transport tpz files from pi 7.1( Dev) to pi 7.0?(prod)
Renu
transport tpz files from pi 7.1( Dev) to pi 7.0?(prod)
Apart from what Abhishek said, why you want to transport objects from an upgraded Dev server to an existing Prod server and that also to a lower version?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Our production system in PI 7.0,Is there any way to transport tpz files from pi 7.1( Dev) to pi 7.0?(prod)
Strange COnfig....i dont think objects can be transported to a lower version.
objects can be transported from PI7.0 to PI7.1 because PI7.1 provides backward-compatibility ....PI7.0 however does not provide forward-compatibility.
Lets see if experts have a different opinion to make!
Regards,
Abhishek.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.