on 07-29-2010 11:57 AM
Hi experts,
I have below requirement from user , Can somebody help me how to handle it?
We would have several bins where we can store only one
material per bin, in 6 boxes per bin, with a specific quantity link to the
material.
Example: for the material A the quantity per box is 20, for the material B
60, so if we recieved 140 pcs A, we would place in tow diferent bins, one
with 120pcs and an other with 20pcs.
But we don't want to place the next reception if it's not the same material
in the same bin, but in the 3th one.
The system could check the quantity, and in this case for an other
reception of te same material, we can place an other 100 in the same second
bin and the reste in an other one..
functionalprocess Masterdata - Bin structure
reason New request
transactioncode New management
problemdescription Today, we used the storage unit type to manage the
warehouse
area by stillage, and we would define a new area manage by material
quantity
Resolved
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Set up your relevant storage type for relevant putaway strategy with mixed storage not marked and addition to existing stock and SUT capacity check marked and capacity check method.You can make use of putaway strategies like C-Open, I - Addition to existing stk, L - Next empty bin
Control the quatity in material master WM 2 view by SUT quantity.
Regds
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.