cancel
Showing results for 
Search instead for 
Did you mean: 

Change quantity (MENGE) field in G/L posting

Former Member
0 Kudos

Hi gurus. I need to be able to change the quantity (BSEG/MENGE) field in a G/L document that has already been posted. I found the area in config to add the field to be able to change. So I made the change in config. Then I pulled up a document that already existed, but the field is still grayed out. I also created a new entry, then went back in to change mode, and the field is grayed out. Any ideas?

Thank you

Janet

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks for the information. I guess we can't change it.

Former Member
0 Kudos

Not sure about my answer, but I know that you are not allowed to modify any value related fields after a FI document is posted (example, value). So, my guess is by changing the quantity amount will be effected and hence FB02 will not allow you to modify quantity.