on 07-26-2010 10:51 PM
I wanted that MRP should create one single purchase requisoition for all the line items in Sales Order.
Currently it is generating separate purchase requition for all the line items.
Thanks
SD
SAP CONS
I am assuming you are using the MTS strategy for the material in your sale order+ (assuming) you are using same material in all your line items. In that case please check the lot size in materialmaster. It must be set at EX (lot for lot). Hence MRP generates PR for each sale order line item.
Please change the same to WB (weekly lot ) or MB(monthly). Then if sale order has multiple line items with different dates in a single month (MB) or week (WB) then system will generate only one PR for all the sale order line items.
Incase your scenario is Made to order (MTO strategy being used in material) then system will always generate unique (different) PR for each sale order line item. You cannot change that. It is the defination of Made To Order for customer.
Thanks,
Ram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Can you also let us know the reason you are looking for single purchase requisition? this may enable to provide a workaround solution for you.
thanks,
Ram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Madhavan SR
You can have Sale order account assigned PO's. I will explain with an example
SO X line item 10 - Mat A =10 pc
SO X line item 20 - Mat B = 5 pc & so on...
then system if configured correctly will generate 2 PR's ( 1 for material A, another for material B) both of them are refrenced back to sale order lien item 10 & 20 respectively.
Now I am assuming both material A & B are being sent to 1 vendor. Then system can club 2 PR's into a single PO with lien item 10 & 20 for Mat A =10 & Mat B = 5. However if both materials should have different vendors then obviously you know you cannot have single PO on 2 different vendors. It will then be 2 PO's.
Either case PO will be Sale order account assigned & tied to Sale order line item 10 & 20. Atleast you can get sale order refrenced Po's.
hope this helps.
thanks,
Ram
Dear Ram,
Thanks for your input. Please let me know the seeting to be done to get PR with reference to Sale order like MRP Type VB / PD, MRP strategy Make to order / Make to Stock m availability check, individual / collective requiremtn. is there possibility of getting single PR for SIngle sale order ? In case if 5 items are there in sale order, belongs to 5 vendor. Need single PR for 5 items of single sale order. Please explain
Madhavan
Hi Jaya Vimal / Ram
We have MRP type as Automatic reorder based on Consumption with external requiremtn consideration. lot sixe EX lot for lot, and MRP indicator (blank) "Both Individual and collective", Material type HAWA, Tradign goods what setting need to done to get Sale order reference in PR. We need PR for each sale order. In case if 5 items are there in sale order, belongs to 5 vendor. Need single PR for 5 items of single sale order. Please explain
Madhavan
Dear ,
Addtionally , just to have few more inputs in your requiremet :
In any Make-To-Order business process , in any sales order , schedlue delivery date of line itemes are different .So when you run the MRP either MD50/MD02 , MRP will not give the same planned order dates or production order will not be having similar schedule finish dates .This requirement date is also depends on the Replishnment Lead Time ( based on the BOM structure-Longest lead time of extrenal procured item in the BOM or In house Production Time of the FG ) .Based on this fact , it will not generate single PR .
In case of MTS , if you have , you may be having Period Lot size (MB/WB/DB) so that it will clubbed together all the requireime which are falling in that period to generate on single PR .
Hope it is clear
Regards
JH
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As all the previous forum member have mentioned it is not possible to create single Purchase Requistion for all the materials,
still PR is for internall use only , you can try to convert all this Purchase requistions into single Purhcase order, because this is the authorised document for Vendor,GR, IR etc.
Reg
Dsk
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.