I'm trying to do a comparison between periods. I create a timestamp attribute (SHIPMENTWINDOW), and I wanna do the following calculation:

KF2 = IF( "PERIODID0" = "SHIPMENTWINDOW" , "KF1 @DAYPRODLOCCUST" , NULL)

When I try to open my planning view, I got a SQL Error.

Any thoughts?

Kind regards,

Lorena Fumian

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Best Answer
    Posted on Feb 19, 2019 at 04:39 PM

    Hi Lorena,

    My bad and I see what is the issue, you are trying to compare PERIODID to Timestamp attribute which is not possible based on the current configuration due to different attribute type and that is the reason you are getting an error.

    You need to change "SHIPMENTWINDOW" to INTEGRE, load it same as PERIODID and then use it in the calculation, it will work.

    Regards

    Ankur

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 18, 2019 at 09:31 PM

    Hi Lorena,

    Assuming you have assigned attribute to the required planning levels correctly, did you try to bring up data in the new view without template?

    Also, it will be helpful if you can copy screenshot of the error.

    Regards

    Ankur

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 18, 2019 at 09:37 PM

    is SHIPMENTWINDOW an attribute to DAY? Is it assigned to the planning level you execute the calculation, assumingly the DAYPRODLOCCUST? Have you put the value from SHIPMENTWINDOW into two single quotes ( '' ) instead of a double quote ( " ) ?-- how to check attribute value

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 19, 2019 at 12:41 PM

    Hi Lorena

    not without further information: Screenshots from the full configuration, and the excel planning view. And do you get the error only when you open a view that contains KF2? Does it happen as well if you remove KF2 and only show KF1? And was that the only change you made to your planning area, or was there something else, e.g. deleting any other attribute or so that was not yet tested?

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Irmhild,

      That was the only change that I made im my PA. And yes, this just happen when I add KF2.

      Follow the KF configuration. zkf2.jpg

      My configuration before was: IF( "PERIODID0" = "$$PERIODID0CU$$" , "KF1@DAYPRODLOCCUST" , NULL)

      And works correctly. But now I wanna the comparasion with the data inside the attribute SHIPMENTWINDOW.

      Thanks a lot,

      Lorena

      zkf2.jpg (65.0 kB)
  • Posted on Feb 19, 2019 at 01:29 PM

    the flag "Calculated" is missing in the key figure header

    and you do not use two single quotes, but two double quotes, plus no blanks between those

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 19, 2019 at 02:17 PM

    Hi Lorena

    I would suggest raising OSS message so that SAP Support can check the system logs.

    Regards

    Ankur

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.