Skip to Content
0
Former Member
Jul 23, 2010 at 08:35 AM

Different Overhead % For Different Material Types

42 Views

Hi

We are using an overhead % to include scrap in out standard cost. However, we only want this overhead to be calcualted for finished materials (FERT) not semi-finished (HALB).

If I undertstand correctly I have to create 2 different Costing Sheets linked to 2 different Costing Variants. Is this correct?

Also, where do I link the Costing Variant to Materials or Material Types.

Thank you

Gill