Hi Gurus,
While running standard costing, system consider 1st available version only. We need 2nd version for standar costing, so if we inactive 1st and 3rd alternative BOM system will consider 2nd for standard cost calculation. So we need to inactive or lock the 1st and 3rd production version. When i try to lock that lock field is in greyed. How we can lock and unlock the production version
Dear Satish,
Two ways to run costing Material level & PV level
in CK11N just check third tab you can get option PV
Here give PV2 & run costing
Regards
Madhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Use C223 transction ,here put Plant and materil for which 3 Pv are created.
And set Lock for othere users,Please revertback if needed (Please you are in change mode)
Regards
Girish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.