SAP MM link with Project system

Former Member
0 Kudos

Hi,

Can you give some link or information about SAP MM link with Project system how it interface how to manage the material and inventory in Project system.

regards,

zafar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

In case of Project procurement either with P/Q Account assignment category ,PO will be linked with the WBSE element and the project stock will get updated upon GRN. Project stock will be stored in MSPR Table

221Q movement in MIGO is GI from project stock

Regards

Amuthan M

Former Member
0 Kudos

Hi,

Thanks for your relply i need some other basic information is there any other way of creating material master or it is same as we are creating normal material master and after PO with account assigmen tP/Q is there any different process for GR MIRO etc. or remaining all are same.

regards,

zafar

Former Member
0 Kudos

Hi,

it is normal only and while preparing pr ( thru PS ) make sure that you are attaching required P/Q ( ACCOUNT ASSIGNMENT) along with correct WBS, so that it can be reflected in PO and further GRN and Stock updation.

After, GI can be posted as per 221/281(P/Q) MVT TYPES.....

Arul Murugan

Former Member
0 Kudos

OK

Answers (0)