Same material & plant, but want to set a different RLT by customer

0 Kudos

I want to have different RLT leadtimes for the same material depending on which customer orders it. For example, my "A" customers to have a 2 day RLT and my "B" customers to have a 5 day RLT. Is this possible to set and have ATP automatically confirm order to the correct leadtime based on customer?

Thank you

Accepted Solutions (0)

Answers (4)

Answers (4)

DominikTylczyn
Active Contributor

Why would like to have different RLTs depending on a customer number? Would you describe your business case in details?

RLT depends on the source of supply not on the source of demand.

Regards

Dominik Tylczyński

lingaiahvanam
Active Contributor
0 Kudos

It is not possible to update 2 different replenishment lead time (RTL) for the same material. You can maintain the RTL for customer A is 2 days and manage customer B 5 days with picking and packing loading date based on shipping point or route or loading group.

Best Regards,

Lingaiah

phanikumar_v3
Active Contributor
0 Kudos

Just Try with different order type for these two customers by using Lead time in days option at VOV8(we can restrict the the customer and order type with OVKK settings by using different customer and Document pricing procedures)

a rough Idea-Discuss with your client on this and update.

Phanikumar.

Lakshmipathi
Active Contributor
0 Kudos

RLT is being used at plant level to procure and manufacture and customer won't bother as long as you supply the material as per their requirement. Having said that, maintain the Requested Delivery Date 2 days later for Customer-A and 5 days for Customer-B, assuming that stock would be made available on the RDD