Hi,

This is basically a stock transport scenario from plant X to Y

The material has been issued from X but when doing the GR in Y, an error comes saying

"COULD NOT MATCH MATERIAL ABC TO THE RESERVATION ITEM"

(ABC is the name of the material)

For ABC material-- In the sales order, the schedule line cat has been changed to something which blocks PR and the REASON for REJECTION has been set as NET-CANCELLATION and the Purchase requisition which was initially assigned had been removed from the sales order and a deletion flag has been set for this line item in the PR

I am not able to interpret, if the above has something to do with the issue or there is totally a different solution which I have missed

Kindly suggest

Thanks,

SS

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2010 at 04:33 AM

    Not reqd any more-this can be closed

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.