Skip to Content

Package / Repository Promotions - IDM v8.0

In IDM v8.0, SP6, in my DEV environment, I have an LDAP repository in my connector AD package. When I promote this package up to QA, will that repository come along for the ride or do I have to recreate my repository once I promote the package?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Feb 18, 2019 at 05:02 PM

    Hi Brandon,

    if it's a repository type, it will transported with your package. If it's a repository (=the "real" connector), you can export/import it through the web UI (idm/admin). It generates a csv that you can use.

    Cheers,

    Clotilde

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.