HI Gurus,

Kindly help me control the demand flow from APO system in the R/3.

We want to change the timeline where demands coming from APO are given back to APW. The idea is to have a control table in APW where we can set a number of days or weeks by sales org / customer number. Within this number of days / weeks, no demand should be created / updated from APO system.

Kindly advise the possible solutions to control Demand in R/3 flowing from APO.

Thanks in advance.