cancel
Showing results for 
Search instead for 
Did you mean: 

Transporting objects from Development System to Testing,Quality and Produtn

Former Member
0 Kudos

Hi Experts,

We have developed one scenario in our project in Development System.

Now we need to transport the same to Testing System and test it there and then transport to Quality system and after that to production system.

Can any one let me know what are all the steps required for transporting like

1) like wat are all the SLD changes to be done.

2) Do I need to create all the SLD settings of development in testing and Quality as well.

Also please let me know if there are any other things other than SLD settings.

Regards,

Pruthvi

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Pruthvi,

You need to create proper underlying transport groups for transporting to Test and Production environment.

underlying Business systems should be linked together. for ex: BS_TST should be linked to both BS_DEV and BS_PRD for transporting, likewise other systems also should be interlinked.

This is normally a Basis activity before transports are being moved.

Regards,

Pavan

Former Member
0 Kudos

Hi,

I assume you know the process on how to transport the IR & ID objects,

Check this for SLD Transports

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/9e76e511-0d01-0010-5c9d-9f768d644...

Regards

Seshagiri

udo_martens
Active Contributor
0 Kudos

Hi Pruthvi,

you need to have both Business System, source and target system of the transport, inside the SLD what is connected to the target IB. You have to define transport targets (in the target SLD) for the source Business Systems.

Regards,

Udo

Former Member
0 Kudos

Hi Udo,

Thank you very much for your reply.

But I didnt get a clear idea of what exactly needs to be done.

Can you explain me some more briefly.

Thanks and Regards,

Pruthvi

Former Member
0 Kudos

Hi Udo,

Thank you very much for your reply.

But I didnt get a clear idea of what exactly needs to be done.

Can you explain me some more briefly.

Thanks and Regards,

Pruthvi

udo_martens
Active Contributor
0 Kudos

Hi Pruthvi,

>But I didnt get a clear idea of what exactly needs to be done.

Please explain kindly what exactly you are missing or did not understand. If you just want to have an overview please read: [SAP help: Transporting XI Objects|http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/content.htm]

Regards,

Udo