cancel
Showing results for 
Search instead for 
Did you mean: 

MRP Run by MRP Controllers

Former Member
0 Kudos

Hi all,

There is an issue with the user exit key used for the MRP controller wise MRP run. We run MRP for the plant with the user exit for MRP controller wise selection of materials. I have given the required MRP controller values in the selection screen of the variant. But after the MRP run, I noticed that even the materials which was not included in the variant was also planned and generated the procurement proposals. We expect only those materials with the assigned MRP controllers in the variant will be planned.i seen in forum links but my issue is not resolved Please help me out. Thanku very much in advance

Accepted Solutions (0)

Answers (0)