cancel
Showing results for 
Search instead for 
Did you mean: 

Batch no.

Former Member
0 Kudos

Hi qm Expert

How can i change batch no. in quality inspection lot. lot created aftre GRN.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In QA02 you can assign new batch number.

Thanks

Former Member
0 Kudos

But how.

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Manish,

Is this your one time requirement or permanent?

If One time requirement:-

Then, You better do by posting the stock to New Material. And have new batch there from the stock posting transaction QA11 itself.

If it is permanent requirement.

Then you better change the settings at.

SPRO>Logistics - General>Batch Management-->Define Batch Creation for Goods Movements for movement type 321 chagne it to No creation to desired one from the option available ther.

So system will generate new batch when ever you perform 321movement, for any material.

Reagrds,

Shyamal

former_member42743
Active Contributor
0 Kudos

For all practical purposes, you can't. As suggested earlier, if the UD isn't made, try canceling the original documents and reversing the movements.

You usually can't use QA02 to change the batch unless it is a manually created lot without reference to any other docs. If it refernces a process order or purchase order, QA02 shouldn't allow you to change it.

FF

Former Member
0 Kudos

hi

Since lot is created by GR, better to reverse and do the GR again with correct batch number.

if you want to create new batch based on inspection results, then do the following

during UD , you can change batch number

Inspection lot stock tab...enter the quanittty in post to New materail, pop window enter same materail and enter batch

Edited by: sami sami on Jul 12, 2010 11:20 AM