question regarding Phantom assembly

Former Member
0 Kudos

Hi

I need to raise a rpoduction order for a material A . I need to supply B and C to produce A which in turn are In House produced materials.Do I make B and C as phantom assembly and instead of raising 3 production orders i can only raise 1

Regards,

PradeepM.

Accepted Solutions (1)

Accepted Solutions (1)

former_member196530
Active Contributor
0 Kudos

Dear Pradeep ,

From your requirement it s clear that A is your FG and B,C are SFG as BOM component which is IN House produced .Bascically , If you do not want to Store B and C but want plan the depedent of B,C along with A's dependent and also cost of B,C routing hrs /component along with A , then you can use this Phantom Assmbly functionality .

But if you want to have physically stored B.C and then re-siiue this SFG to A for final production , I think you should go for Collecyive Order creation in one sort .

Hope it si clear

Regards

JH

Edited by: Jiaul Haque on Jul 9, 2010 9:54 AM

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Pradeep

Phantom Material means it is virtual material that means item does not exists. It is a logical grouping of material rather than functional. The purpose of these assemblies is to make maintenance of the item easier as the product evolves and changes.

Regards

Edited by: nikhil.jain159 on Jul 9, 2010 9:00 AM

Dsk
Active Contributor
0 Kudos

>

> Hi

>

> I need to raise a rpoduction order for a material A . I need to supply B and C to produce A which in turn are In House produced materials.Do I make B and C as phantom assembly and instead of raising 3 production orders i can only raise 1

>

> Regards,

> PradeepM.

1. Hi In your case you cannot make the same since B&C are not phantom,

2. The are real materials - you need to procure them or prodcue them to have the C produced.

For example - in case before you make A you assemble B + C as X and then you do some operation to get A..

in such case your X becomes a logical grouping so you can make X as phantmo material . So when you create the demand for A the requirement will be directly passed on to B and C.

3. Only in such condition you need to make phantom..

i have the strucuture below.

Parent -Mat A

intemittennt =X

comp1=MatB

Comp2=MatC

thanks andreg

Dsk

Former Member
0 Kudos

So IF i assemble B and C as X and making X a Phantom assembly then there is no need for raising seperate production orders for B and C right

regards,

PradeepM.

Dsk
Active Contributor
0 Kudos

Hi,

  • Please reefer the SAP help for hte phantom assembly in detail.

  • You are wrong ..Only X is phantom so you need not create any prod order for X only ..

reg

dsk