Skip to Content
0
Former Member
Jul 09, 2010 at 04:59 AM

Change number

60 Views

Hi Gurus,

I have two issue in ECR

1) When i try to assign an change number to the material through production version (C223) i am getting the following error message "The change number was not assigned to all entries you have selected.

Incorrect entries are still selected."

2) I have created change number for the material and i assigned that number to material through prod. version. Then when i try to create recipe through prod. version system throwing an error message " Change rule 3 assigned to the profile". I have checked all the parameters and everything is looking fine but still system throwing this error message.

Kindly help to fix the issues.